Office Hours Mon - Thurs 9am to 3pm,

Thurs Eve 6pm to 7:30 pm,  Fri 9am to noon

The Town of Hiram is a MUBC Town and has adopted the building code part of MUBEC. An energy certificate is required from your contractor or insulation contractor at the final inspection. (Form available  below) 


To get your electricity connected have your electrician file the 1360 form with my office, do not send it to CMP, I will conduct the electrical inspection when needed. You will also need a State of Maine Electrical permit for any rental units and all commercial work and The State of Maine Electrical Inspector will handle those inspections. 

Code Enforcement Officer, Building and Plumbing Inspector

Position is currently vacant please call the office at 625-4663 and we can set up an appoint for you. 


Building Permit Applications need to be either picked up or mailed to you, please either call or email if you are unable to pick one up. 


All electrical/ plumbing work must be done by a licensed electrician / plumber, except as provided within these codes.


The Town of Hiram has adopted the following portions of MUBEC

 The Maine Uniform Building Code (“MUBC”) consists of the following

components of MUBEC:

2009 International Residential Code (IRC)
2009 International Building Code (IBC)
2009 International Existing Building Code (IEBC)


The following provisions of the American Society of Heating, Refrigerating and Air-Condition Engineers (ASHRAE) Standards:
62.1 - 2007 (Ventilation for Acceptable Indoor Air Quality)
62.2 - 2007 (Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings)
E-1465-2006, Standard Practice for Radon Control Options for the Design and Construction of New Low-Rise Residential Buildings.



Permit Information - CEO

Phone 207-625-4663 Fax 207-625-7635

25 Allard Circle, hiram, me 04041